UBC Baseball

The UBC Baseball Indoor Training Centre provides year round state of the art training for the UBC T-birds, baseball and softball camps, and the McKaig Performance Institute.

The building structure is comprised of concrete foundations, glulam post and beam with laminated strand lumber (LSL) walls and light wood framed offices and roof areas. Seagate was responsible for the fabrication and installation of the wood structure. The use of an innovative wood tilt up method to erect the main glulam post and beam, and LSL wall structure dramatically improved the schedule and overall costs. The main structure was installed in two tilt days over a 7 day period. The batting cages main bay area is 180-0 long x 40-0 wide x 30-0 high.

PROJECT DETAILS


client: UBC Baseball Training Centre


general contractor: Kindred Construction


architect: Michael Green Architecture Inc.


engineer: Equilibrium Consulting


completion date: 2015


Mass Timber Solution Guide

Mass Timber Solution Guide

Enter your e-mail to subscribe to our newsletter and receive your Mass Timber Solution Guide. Your privacy is our policy.

You have Successfully Subscribed!

Brock Commons Construction Overview

Brock Commons Construction Overview

 

Enter your e-mail to subscribe to our newsletter and receive your exclusive Brock Commons Construction Overview. Your privacy is our policy.

You have Successfully Subscribed!

Brock Commons Construction Overview

Brock Commons Construction Overview

 

Enter your e-mail to subscribe to our newsletter and receive your exclusive Brock Commons Construction Overview. Your privacy is our policy.

You have Successfully Subscribed!